Application:
Reuse
Keywords:
California, reuse, wastewater , mixing, short circuiting, stratification, stagnation
Reservoir Size:
This is an above ground tank of 0.2 MG.
SolarBee Installation:
Date: 12/13/2006 Installed 1 SB1250v12PW unit.
Project Objectives:
OBJECTIVE: Provide complete mixing throughout the reservoir to eliminate stratification, short circuiting, stagnate water conditions, provide a consistent water age, and eliminate odors.
For more information on this or any other SolarBee installation, please call 866 437 8076.
Copyright 2012 SolarBee, Inc.
^
